At the boom tip, the SRT’s rail-threading machine workhead utilizes a four-axis, electronically controlled, hydraulic manipulator head.
Manipulator head allows for:
Complete control of rail threading operation
Rigid constraint of the rail during threading
Installation of rail into curve block plates
Installing of rail in to existing spiked plates for out-of-face rail remediation
Handling of tipped rail
The stops on the SRT's mechanical boom swing prevent fouling of adjacent track, allowing it to continue laying rail while having a live adjacent railway. It has a dual-sided operator cab, which improves visibility, and the SRT also eliminates the need for certifications associated with operating a crane.
About Swingmaster:
Swingmaster provides the industry standard in mobile hi-rail cranes customized to fulfill your requirements. Their mobile hi-rail swingloaders designed specifically for the railroad industry, are all made in the U.S. With a wide variety of available attachments and options, Swingmaster Swingloaders tackle the toughest applications.
Please call to order or for more information.
Show more
Request a quote
Manipulator Head Details
Complete control of rail threading operation
Rigid constraint of the rail during threading
Installation of rail into curve block plates
Installing of rail in to existing spiked plates for out-of-face rail remediation